Skip to content
Workflow · Finance close · Opening soon

Construction job costing

Compare each job's budget to its actual cost. See the variance and variance percent for each job from your QuickBooks exports.

Early access opens shortly. Check back soon.

Someone typed

“compare each job's total budget to its total actual cost (labor, materials and subcontractors added up) and show the variance and variance percent by job”

The agent read it as

Compare each job's total budget from QuickBooks job budgets to its total actual cost (labor, materials and subcontractors added up) from QuickBooks job cost detail and show the variance and variance percent by job, using actual minus budget and percent of budget.

What the agent built

3 steps, each one an ordinary Mammoth step you can open and change.

  1. File
    QuickBooks job budgets
    CSV export · 8 rows
  2. File
    QuickBooks job cost detail
    CSV export · 36 rows
  3. Step
    Total actual cost by job
    Step 1
  4. Join
    Bring in actual costs
    8 of 8 paired
  5. Step
    Calculate job variances
    Step 3
  6. Result
    Job Budget Variance
    8 rows
  7. Schedule
    Runs when you say
    Proposed

Checked on the sample files: every step ran, 8 rows came out, and the join paired 8 of 8 rows.

What you get back

The result of that run, the rows to look at first.

Job Budget VarianceSample data8 rows
JobVarianceVariance percentTotal budgetActual cost
Oak Ridge School-49,500-41.25120,00070,500
Maple View Clinic-5,700-6.6386,00080,300
Cedar Point Renovation-45,700-31.52145,00099,300
Harbor Lofts Buildout-18,600-18.9898,00079,400
Willow Creek Garage6,25011.5754,00060,250
Pinecrest Fire Repair-3,600-4.7476,00072,400
Elm Street Addition-48,400-36.67132,00083,600
Birch Hollow Deck7,80016.6047,00054,800
8 rows in the result. Sample data: illustrative figures, not business results.

How do you compare each job's budget to actual cost?

Export your job budgets from QuickBooks and your job cost detail for labor, materials, and subcontractors. Mammoth totals the actual cost by job, compares it with the budget, and shows the variance and variance percent for each job. The variance is actual minus budget, and the percent is based on budget.

How it works

How to use the Job Budget Variance workflow

  1. 1Get early accessWe invite people in small batches, job by job. You'll land on this workflow, already built and checked on the sample files.
  2. 2Swap in your exportsUpload your own files as they come out of your tools. The agent checks the workflow on your rows.
  3. 3Change it in words, then turn it onSay what to change and see the new result before anything saves. Then choose when it runs.

Job Budget Variance: questions

What export should you use from QuickBooks?
Use a job budgets export for the budget side and a job cost detail export for the actuals side. Both should include a job name or job ID so rows can be matched.
What happens to rows that do not match a job?
Rows that do not match a job in the other file are left out of the job comparison. You can review them separately and decide whether to fix the source data or add a matching rule.
How do you change the rules in words?
You edit the steps in plain language. For example, you can change how jobs are matched, which cost types are included, or how the variance and variance percent are calculated.

Get early access to this workflow

It will open already built and checked on the sample files. Swap in your own exports and see your result.

Early access opens shortly. Check back soon.

Workflows like this

Consolidate entities, compare budget to actual, build a trial balance, review month-on-month moves and work out commission.

All finance close templates →